Enter your Zip Code to find your nearest dealer:

Before & After Photos

Click on a photo to enlarge.

Pipe Leak in Quicksburg, VA

Today, our team visited the customer's residence to address various plumbing concerns. We identified multiple issues, including a leaking pipe in the crawl space and the absence of a shut-off valve for the rear hose bib. Additionally, the master bathroom shower was found to have a defective cartridge. We noted that the main water shut-off valve is seized, and there is no pressure reducing valve (PRV) present, with the current water pressure measuring at 78 psi. It's important to mention that this reading may fluctuate during the night when pressure typically increases.

Septic Inspection in Mount Jackson, VA

Ran camera down all 4 drain field lines and found lines partially clogged with debris.

Drain field lines need to be jetted and snaked. Pipe looks to be in good condition but I was unable to get all the way out of any of the lines. Took potability test and dropped of the lab.

Clogged Drain in New Market, VA

Water gurgles and backs up into kitchen sink when it rains/kitchen sink won't drain.

Water Treatment in Edinburg, VA

A 5 year old Lowe's softener is not working and she'd like to install a new one. Another company told her all the existing WT equipment was all installed backwards.

Water Treatment Service in Woodstock, VA

Arrived to perform a Water Treatment Service on a 1044 AOS Softener, am also to completely empty and clean Brine Tank. Clean salt will be saved and dirty salt thrown away. New salt will be added to fill Brine tank.
          Began by discussing scope of work with customer and presented estimate for service that was accepted by customer. Water was tested upon arrival for Hardness. Results below. Softener was bypassed and depressurized. Unit valve head was taken apart. Seal stack was in good condition and so was cleaned and lubed. Drive cap assembly was cleaned and lubed. Water meter assembly was inspected and in working order. Injector cap was removed. White Injector was found to be partially clogged and so was swapped out. Injector housing, cap, and screen were thoroughly cleaned. Unit valve head was put back together. Brine tank was completely emptied. Float assembly and cylinder were removed and thoroughly cleaned. Brine tank was put back together and filled with saved salt and new salt. (200Lbs per service). Water was turned on to unit to begin REGEN cycle. Unit was sent into its REGEN cycle and allowed to complete a fill REGEN. Float assembly and Brine line were pressure tested during Fill and Draw cycles. No leaks appeared. Water was tested post service for Hardness, Iron, PH, and Chlorine. 

 


Pre Service Hardness- 6 Grains
Raw water Hardness- 8 Grains
Post service test results:
Hardness- <1 Grain
Iron- 0.0 PPM
Chlorine- 0.0 PPM
PH- 7.0